Hot and tired, Bart laid down on the bedroom floor for a rest. The framing continues!
Bart started the framing on June 22nd; with help from Kyler Stoker and Shane Selley. Shane and Kyle also helped. At this point, it looks really small. Can the office and music room really fit in that tiny space?
Getting ready to pour the basement floor. Base plumbing, foundation sealing, backfilling and placement of window wells has been done!
Bart arrives at the site at 6:00 am, anxious to get a picture of the foundation with the forms removed. This is looking south=southeast.
Pouring the foundation walls. At this point it looks big.
Footings done with foundation forms going up. At this point, it looks small!