Gundersen Happenings

Blog Archive

  • ▼  2009 (16)
    • ▼  September (16)
      • Our two indulgences: the master tub (can't wait) ...
      • Transfer panel. One fur...
      • Inside framing is done. At this point it looks...
      • The back door and kitchen and master bedroom window.
      • Common Cents Construction setting the trusses.
      • Kyle and family came for the July 4th holiday and ...
      • Kirt, Crista and family visiting from Shingle Spri...
      • Hot and tired, Bart laid down on the bedroom floor...
      • Bart started the framing on June 22nd; with help f...
      • Getting ready to pour the basement floor. Base pl...
      • Bart arrives at the site at 6:00 am, anxious to ge...
      • Pouring the foundation walls. At this point it lo...
      • Footings done with foundation forms going up. At ...
      • We have a hole....All in one days work!
      • Groundbreaking May 19, 2009 at 8:30 am. The hole i...
      • When we first moved back to Preston in July of 200...
  • ►  2008 (2)
    • ►  August (1)
    • ►  March (1)

About Me

Gundersen Family
View my complete profile

Sunday, September 27, 2009





Inside framing is done. At this point it looks huge!! The vaults are amazing. The electrical is started. Nephi Rogers is helping Bart with wiring. Nephi lives in my great-grandpa Ether Rawlings home in Fairview.

Posted by Gundersen Family at 1:16 PM
Labels: 3:00 pm, August 21st

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)